Action Station buy-out
With agreement from Police Scotland, and an award from the Scottish Land Fund, Action Porty has brought our former Police Station building into community ownership.
In December 2025, the Scottish Land Fund announced they are granting “£499,570 to Action Porty for the purchase of the former Portobello Police Station, in Edinburgh, through a Community Asset Transfer (CAT) from Police Scotland. The group will use the space to create new studios and workspaces for community organisations, community activities and artists in a central, high-street location.”
The space will initially be used to create community and artists studios and workspaces that support and add to the vibrancy of the High Street. Community ownership means that future generations will be able to use the building as they need.


Our aims
- Breathe new life into an iconic public building which has served the community for almost 150 years, creating publicly accessible spaces and safeguarding it for future generations to enjoy
- Provide needed facilities and meaningful opportunities for community use in a central location within our expanding community
- Provide a clearly different offer from other community owned or operated spaces within Portobello
- Bring life and activity to the building, supporting and adding to the vibrancy of the High Street in ways that are accessible to the whole community
- Further the purposes of “Community Wealth Building”, ensuring the project supports Fair Work, equality of opportunity, supporting the success of our local businesses and recycling any profit into community benefit
The Building
The building is a much-loved feature of our high street. It was built as a town hall and municipal offices – including a registrar’s office, fire station, magistrates court and police station as well as purpose-built accommodation. Construction began in 1877 and it opened in 1878.
The building later served as the public library for Portobello between 1897 and 1963, and as our police station until closure in 2016. For the following eight years it was used as offices for Police Scotland.
"The building is a flamboyant display of civic pride in a prominent High Street location." - Historic Environment Scotland


Community ownership
In a survey by our former Community Council, 97% of respondents backed our proposal to bring the Police Station into community ownership. A packed community consultation in November 2024 in the library (part of Heart Talk Porty) also overwhelmingly endorsed the proposal.
Action Porty submitted a Community Asset Transfer request to Police Scotland in January 2025. Police Scotland agreed to give the community first right to buy and supported the handover. The building was officially valued at £555,000. The Scottish Land Fund award contributed 95% of the valuation and Police Scotland (with Scottish Government Ministers’ agreement) agreed to reduce the price to £499,500 to enable community ownership. We completed the community buy-out on 23 March 2026.
A huge amount of work by Action Porty volunteers, funders and experts preceeded the purchase of the building.
Scottish Land Fund paid for the building survey and business plan (put together by Sandra Macaskill).
Architectural Heritage Fund paid for the Building Warrant applications and Planning Applications to change its use.
DTAS Green Shoots covered the cost of conveyancing.
A 75% loan/ 25% grant from Foundation Scotland is enabling us to cover crucial initial costs including electrics and fire safety, heating systems, networking and insurance.
Local professionals have provided their work for free. James Lewis conducted the structural engineering survey. Kieran Gaffney and his team put in a huge amount of work to plan the change of use and secure the planning applications and building warrants. Frazer McNaughton, Mark Boggis, Kieran Gaffney and Justin Kenrick led on the negotiations, consultations and what has felt at times like a wild goose chase – that has now caught a much loved goose that will lay golden eggs for the community.
Many volunteers have since stepped forward to transform the building into a comfortable, lively space, including a new clock team with expertise in moving the clock to summer time and back!

Next steps
As we know from our experience with Bellfield, taking on an old, listed building is not without challenges!
Our first steps are therefore part of a multi-phase plan to meet key community needs that will evolve over time. The building will need to generate income while plans are prepared and money raised for more significant adaptations.
Looking ahead, we will continue to make sure that we are meeting distinct needs rather than competing with any other community offer.
In the medium term we hope that the majority of the ground floor will become publicly accessible with quieter more private spaces on the upper floors, and a lift installed to improve access once we have been able to raise the funds for it. Over the longer term we hope to provide much more than that, based on community consultation, fundraising and permission from the planners.
Currently, we are aware of significant demand for affordable office space for community organisations and artist studios locally. We envisage a range of further community needs that would increase footfall on our high street and provide a space distinct from existing local options.
















Future options
While the initial proposal is for a vibrant community hub with offices for community benefit organisations and artists and others studios, possible future plans (all subject to community consultation) might, for example, include:
- a ‘living room’ along the High Street that could provide a socially inclusive space (with e.g. pre-school kids with their carers in the mornings, older folk’s quieter space in the afternoon, youth in the evenings),
- a gallery and/ or youth-focused space at the rear along the lane,
- a ‘residency’ upstairs at the rear (for groups of artists or folk from other communities to come and stay in order to work together during short term stays)
- a dedicated space for the High School to work with kids struggling at school, and possibly
- a touch down space for the Police when patrolling the Prom, and/ or a space for health or social service provision if needed.


“Judging from the new buildings recently finished, or approaching completion, the addition to the rental during the past year will be found even greater than in any similar period of the burgh’s history. As became the civic dignitaries of so thriving a community, the Town Council some time ago resolved upon providing suitable buildings in which to carry on the municipal and police affairs of the town. A site was duly secured in High Street, to the north-west of the premises at present rented by the council: and where formerly stood a tile-roofed one storey tenement, there is now nearing completion a building not unworthy of the “Brighton of Scotland”. Designed by Messrs Robert Paterson & Sons, Edinburgh, the building is in the Scotch baronial style. It has a frontage to High Street of 57 feet, and another towards Ramsay Lane, on the east, of 103 feet, while the block extends back from High Street to a distance of 143 feet.
The Scotsman – 17 June 1878
On the portion of the ground floor entered from the Main Street, commodious rooms are provided for the Town Clerk, the Collector and Treasurer, and the burgh surveyor; while on the remaining portion, entered from Ramsay Lane, are the Police Superintendent’s and charge rooms, cells for the temporary detention of prisoners, stores for the cleaning and lighting department, and accommodation for the burgh fire engine. On the upper floor towards the front of the Courtroom 33 ft 3 in by 2 ft 6 in and the Council Chamber 33 ft by 20 ft 2 ins. Entering off the latter is a committee room 18 feet by 15 feet; as also a cloak-room, lavatories, etc. To the rear of the Courtroom and Council Chamber are a constables’ room and dormitory, a dwelling house for the Superintendent of Police, and other necessary accommodation. Over the High Street entrance to the building is an oriel window corbelled out so as to give the facade a bold and massive appearance. Higher up is a tower with crow-stepped gables on the four sides, adapted for the introduction of a clock, and having corbelled turrets at its corners. The frontage to Ramsay Lane is in keeping with that towards High Street, though of a less elaborate description. The estimated cost of the building is slightly over £4000.”